We’ve gotten a lot more done since the last update. First, I framed the insides of the walls with 1×2 “studs” and 3/4″ R-Max 3 insulation. Lots of measuring and cutting with the miter saw. Insulation in place and attached with Gorilla Glue. (There will be 1/8″ luan over the interior of the side panels…